Free · No P6 Licence Required · 100% Private · Australia

Your P6 Schedule.
Health-Checked in Seconds.

Upload your Primavera P6 XER file and get a free DCMA 14-point schedule health report instantly — no software, no licence, no data leaving your browser.

DCMA 14-Point Assessment Critical Path Analysis Calendar & Holiday Report 1 free analysis per day

What xerScore Checks

The same quality metrics used on multi-billion dollar infrastructure projects — free, in your browser

📊
DCMA 14-Point Report
Full Defence Contract Management Agency schedule quality assessment. Logic, leads, lags, constraints, float, critical path — all 14 checks with PASS/FAIL/WARN results.
FREE
🔴
Critical Path Analysis
Every activity on the critical path listed with dates, durations, and float. Forward and backward pass CPM engine runs entirely client-side.
FREE
🟡
Near Critical Activities
Activities with total float of 1–14 days — the ones most likely to become critical if a delay hits. Essential for risk-based schedule reviews.
FREE
🔗
Open Ends Detection
Activities missing predecessors or successors — a common cause of DCMA failures. xerScore identifies every open end instantly.
FREE
📋
All Tasks View
Full activity list with float values, dates, durations, and calendar assignments. Sortable, filterable, exportable to CSV or JSON.
FREE
📅
Calendar Report
All project calendars with a 12-month grid showing non-working days, public holidays, and RDOs. Supports Australian OLE/Excel date formats.
FREE

Simple, Transparent Pricing

Start free. Upgrade when you need more.

Free
$0
No credit card. No licence. Forever free.
  • 1 XER analysis per day
  • DCMA 14-point report
  • Critical path analysis
  • Near critical activities
  • Open ends detection
  • All tasks view + CSV export
  • Calendar & holiday report
  • Watermarked output
  • Branded PDF export
  • Custom DCMA thresholds
  • Working day numbering
Start Analysing →
Team
$79/mo AUD
5 seats. Compare schedules. Shared workspace.
  • 5 user seats
  • All Pro features
  • XER vs XER comparison
  • Shared team workspace
  • Baseline comparison
  • Bulk CSV / JSON export
  • Team admin dashboard
  • API access
  • White-label reports
  • n8n webhook integration
Contact Us →
Enterprise
Custom / POA
API, white-label, n8n integration. Built around your workflow.
  • All Team features
  • Unlimited seats
  • API access (JSON reports)
  • White-label branded reports
  • n8n webhook integration
  • Custom hazard/threshold library
  • SLA & dedicated support
  • On-premise option
  • Volume pricing
Talk to Us →

All prices in AUD. Cancel anytime. Questions? hello@xerscore.com.au

See What You Get

Real outputs from real P6 schedules — download and explore before you upload.

📊
DCMA 14-Point Report
Free Report
DCMA 14-Point Assessment
Full schedule quality assessment across all 14 DCMA checks — logic, leads, lags, constraints, float, critical path — with PASS / FAIL / WARN badges and a summary health score.
⬇ Download Sample PDF
📅
Calendar Report
Free Report
Calendar & Holiday Report
12-month grid view of all project calendars — working days, non-working weekends (light red), and public holidays / RDOs (solid red). Year navigation built in. Australian OLE date format supported.
⬇ Download Sample PDF
xerScore logoxerScorePRO
SmartConstructAI
📋
xerScore — P6 Schedule Analyser
Drop a Primavera P6 .xer file — CPM + DCMA 14-point analysis runs entirely in your browser
✓ Pro Plan — Unlimited Analyses
Running CPM & DCMA analysis…
DCMA 14-Point Assessment
Defense Contract Management Agency Schedule Quality Metrics
EXPORT:
Critical Path
Activities with Total Float = 0 (driving the project end date)
Near Critical Paths
Activities with Total Float 1–14 days (high risk activities)
Open Ends Analysis
Activities missing predecessors or successors
All Schedule Activities
Calendar Report
Project calendars — working days and non-working day exceptions
Calendars
Working
Non-working (weekend)
Non-working (exception)
⏱️

Daily Limit Reached

You've used your 1 free analysis for today. Upgrade to xerScore Pro for unlimited analyses, branded PDF reports, custom DCMA thresholds, and working day numbering.

Limit resets at midnight each day.

⚙ DCMA Threshold Settings

Customise pass/fail thresholds for your organisation's standards.
Defaults follow the DCMA 14-point schedule quality standard.
Logic
Missing preds/succs — max %
%
Leads
Negative lags — max %
%
Lags
Positive lags — max %
%
Non-FS Relationships
SS, FF, SF types — max %
%
Hard Constraints
Fixed dates — max %
%
High Float
>44 WD float — max %
%
High Duration
>44 WD duration — max %
%
CPLI
Critical Path Length Index — min
BEI
Baseline Execution Index — min